OrangeTee.com
PROJECT LAUNCHES
Vertex
 
 
Development

Ultimate Business Solution
Vertex is a distinctive 8-storey building comprising 550 units that are perfect for the modern entrepreneur. In today's competitive business environment, Vertex is a highly strategic development that is well-placed to add value to your business.

 


Location
 


Great Business Accessibility

At Vertex, access is a key benefit as it is located next to the entrance & exit points of the new Kallang Paya Lebar Expressway and just minutes to the Pan Island Expressway providing immediate connection to the city. Futhermore, it is sited a stone's throw away from the new Tai Seng and Paya Lebar MRT stations. This ensures that your business has speedy access to and from all parts of the island for both human and vehicular traffic.

Environment

Conducive Business Environment
Centrally located in a thriving business district, Vertex offers a conductive business environment with pro-business building design and landscaping. Beside close proximity to major housing estates, it also provides unparalleled connectivity from other tech parks & industrial estates.
Frontage
Strong Business Impression
Vertex features an all glass facade for its ground floor units providing excellent frontage on all sides of the development. Units on the 1st, 2nd, 3rd and 4th storeys enjoy direct vehicular access with wide driveways. Upper storey units are accessed via office-like lift lobbies and classy corridors.

Aesthetic
Optimum Business Reception
With more than 1,000 parking lots you can simply whiz in to a great reception at Vertex with its office-like aesthetic design, well-appointed features and practical layout.

Amenities

Thriving Business Hub
More than just a conducive place for people to work and for businesses to flourish, Vertex enjoys the advantage of being surrounded by amenities for both business and leisure. Enjoy close proximity to CBD, Marina Bay, Sports Hub, the up coming of Paya Lebar Regional Centre, Tampines Regional Centre and other major leisure spots.

 
 
Unit Floor Plans
'

 


Specifications
 
Foundation
  Precast Reinforced Concrete Pile and/or other approved foundation system complying with SS CP4
Superstructure & Substructure
  Reinforced concrete and/or post tensioned concrete structure complying with SS CP65
Roof
  Reinforced concreted and/or post tensioned concrete structure flat roof with waterproofing system
Floor Loading Capacities
 
1st storey (warehouse) = 10.0 KN/m2
1st storey (mezzanine) = 5.0 KN/m2
1st storey (canteen) = 5.0 KN/m2
2nd to 3rd storey warehouse) = 7.5 KN/m2
4th to 8th storey (factory) = 7.5 KN/m2
 
Structure Floor To Floor Height
 
1st storey = 6.50 meters
1st storey (mezzanine) = 3.00 meters
2nd to 3rd storey = 4.00 meters
4th to 8th storey = 3.50 meters
     
Windows
  Aluminium framed windows with tinted glass
Doors
  - Timber doors with selected quality lock sets to Factory and Warehouse units
- PVC doors with quality lock set to toilets
External Walls
  Reinforced concrete and/or clay brick with cement and sand rendering and emulsion paint finish
Ceilings
  - Skim coat and/or off-form with paint finish to all units
- Plaster board and/or skim coat and/or off-form with paint finish to toilets
Internal Wall Finishes
  - Cement and sand plaster and/or skim coat with paint finish
- Tiles and/or cement and sand plaster and/or skim coat with paint finish to lift lobbies
- Tiles and/or cement and sand plaster with paint finish to toilets
Floor Finishes
  - Power float and/or screed finish to Factory and Warehouse units
- Tiles and/or power float and/or screed finish to lift lobbies
- Ceramic tiles to toilet
Lifts
  - 4 service lifts
- 6 passenger lifts and 2 passenger cum fireman lifts
Electricial   - Emergency lighting including exit sign to all units provided in compliance with statutory requirements.
- 60A 3 phase power supply to meter compartment for all 2nd and 3rd storey warehouse units except 100A 3 phase power supply for units #02/03-08, #02/03-21, #02/03-36, #02/03-49
- 60A 3 phase power supply to meter compartment for all 1st storey warehouse units
- 200A 3 phase power supply to canteen
Telecommuncation Services   Local box and pre-wired telephone cable up to telephone riser duct will be provided to each factory/warehouse unit to facilitate telephone connection upon application by purchasers
Master Antenna System (MATV)   MATV ready tap-out is provided
Fire Protection
  Fire protection system provided in compliance with statutory requirements
Sanitary and Plumbing Installation
  Sanitary and plumbing system provided in compliance with statutory requirements
Mechanical Ventilation
  Mechanical ventilation provided in compliance with statutory requirements to designated areas where natural ventilation is not possible
Communication System
  Communication system provided in compliance with statutory requirements
Lightning Protection
  Provided in accordance with Singapore Standard Code of Practice CP-33: 1996
Project Information
 

Zoning: Industrial Business 1
Tenure of Land: 60 years leasehold w.e.f. 1st January 2007
Lot / Mukim: Lot No. 6179N of Mukim 23
Planning Approval No.: P160107-06F2-A011 dated 08th June 2007
Building Plan No.: A1525-00015-2006-BP01 dated 26th June 2007
Expected TOP date: 3rd September 2014
Expected Date of Legal Completion: 3rd September 2017

     
Contact   For more information, please contact:
    Main Line: 6763 7227
   

David Ang
Handphone: 9791 6225
email: david.ang@orangetee.com