OrangeTee.com
PROJECT LAUNCHES
Trivex
 
 
The Development

Trivex is a distinctive 17-Storey building with 231 units designed for light and clean business use. It'll be the defining landmark in its locality containing Singapore's best known business entities. The perfect place for entrepreneurs strategising to achieve the 3 main business goals - Expand, Extend, Excel.


The Connection

Sited in a major business hub just off the junction of MacPherson & Paya Lebar Roads, with accessibility to all parts of the island that is second to none, Trivex elevates your business presence to the next level with its coveted address featuring the number '8' at Burn Road.


The Location
 


Located next to Tai Seng MRT Station, and at the entrance and exit points of the new Kallang Paya Lebar Expressway, you'll be assured that people can get to you in the fastest way possible from all major business centres in just minutes.


The Amenities
Amenities include the future commercial developments at Paya Lebar Central and the many food and beverage establishments surrounding Trivex. They are all just a stone's throw away and readily accessible via the MRT or via roads directly linking Trivex to all of them.

The Environment
Trivex is designed to include features found in modern office buildings with wide glass panels, clean lines, and planned landscaping, creating an inspiring and outstanding corporate image. Units on upper storeys are accessed via office-like lift lobbies and stylish corridors.

The Impression
Whiz in to a great reception at Trivex with its functional layout and well appointed features. Parking will be a breeze with more than 300 parking lots spread over 3 levels. Trivex itself will have a commanding presence and high floor units will enjoy a panoramic view.
 
Unit Floor Plans
'

 


Specifications
 
Foundation
  Bored piles foundation and/or other approved foundation system complying with SS CP4
Superstructure & Substructure
  Reinforced concrete and/or post tensioned concrete structure complying with SS CP65
Roof
  Reinforced concrete and/or post tensioned concrete structure flat roof with waterproofing system
Floor Loading Capacities
 
1st storey (Warehouse) = 10.0 KN/m2
1st storey (Canteen) = 5.0 KN/m2
2nd to 3rd storey (Carpark) = 2.5 KN/m2
4th to 17th storey (Factory) = 7.5 KN/m2
Roof = 2.5 KN/m2
All Ramps = 5.0 KN/m2
 
Structure Floor To Floor Height
 
1st storey = 5.00 metres
2nd to 3rd storey = 3.50 metres
4th to 17th storey = 3.30 metres
Windows
  Aluminium framed windows with tinted glass
Doors
  - Timber doors with quality lock sets to Factory and Warehouse units
- PVC doors with quality lock sets to toilets
External Walls
  Reinforced concrete and/or clay brick with cement and sand rendering and paint finish
Ceilings
  - Skim coat and/or off-form with paint finish to all units
- Plaster board and/or skim coat and/or off-form with paint finish to toilets
Internal Wall Finishes
  - Cement and sand plaster and/or skim coat with paint finish to all units
- Tiles and/or cement and sand plaster and/or skim coat and/or spray textured coating with paint finish to lift lobbies
- Tiles and/or cement and sand plaster with paint finish to toilets
Floor Finishes
  - Power float and/or screed finish to Factory and Warehouse units
- Tiles and/or power float and/or screed finish to lift lobbies
- Ceramic tiles to toilet
Lifts
  - 3 passenger lifts and 1 service cum fireman lift
Electrical   - Emergency lighting including exit signs to all units provided in compliance with statutory requirements
- 100A 3 phase electrical supply to Warehouse units at 1st storey
- 60A 3 phase electrical supply to Factory units 01 to 08 at 4th to 12th storey, Factory units 01, 02, 07 & 08 at 13th storey & Factory units 03, 06, 11 & 14 at 17th storey
- 40A 3 phase electrical supply to all other Factory units
- 200A 3 phase electrical supply to canteen at 1st storey
Telecommuncation Services   Telephone block terminal and pre-wired telephone cable provided in each Factory/Warehouse unit to facilitate telephone connection upon application by purchasers
Master Antenna System (MATV)   MATV tap-off box provided in each Factory/Warehouse unit
Fire Protection
  Fire protection system provided in compliance with statutory requirements
Sanitary and Plumbing Installation
  Sanitary and plumbing system provided in compliance with statutory requirements
Mechanical Ventilation
  Mechanical ventilation system provided in compliance with statutory requirements
Communication System
  Communication system provided in compliance with statutory requirements
Lightning Protection
  Lightning protection system provided in accordance with statutory requirements
Project Information
 

Zoning: Business 1
Tenure of Land: Leasehold 60 years from 20th May 2008
Lot/Mukim: Lot No. 10119M of Mukim 24
Planning Approval No: P220508-33A3-Z000 dated 23rd July 2008
Building Plan No: A1409-00002-2008-BP01 dated 20th August 2008
Expected T.O.P Date: 17th February 2016
Expected Date of Legal Completion: 17th February 2019

     
Contact   For more information, please contact:
    Main Line: 6763 7227
   

Garrick Ong
Handphone: 9336 5559
email: garrick.ong@orangetee.com