OrangeTee.com
PROJECT LAUNCHES
Mid View
 
Midview, with its office-like design, is meticulously planned for functionality and practicality.
A building constructed for the next millennium, all the features of the building are provided to maximize the synergy between operational flow and convenience.
 

Free DHTML scripts provided by Dynamic Drive

Practicality
Minimal columns for maximum space. That’s just one aspect of the thoughtful layout design of each unit.

Large clear spans in between make way for easy movement. Ample loading and unloading bays ensure maximum efficiency of goods transfer.


click here to view 1st storey plan
click here to view 2nd storey plan
click here to view 3rd storey plan
click here to view 4th storey plan
click here to view 5th storey plan
click here to view 6th storey plan
click here to view 7th storey plan
click here to view 8th storey plan

 

Ideal Location
Midview is a 60 years leasehold light and clean industrial building located at the gateway to the western industrial hub.

Its close proximity to the PIE and AYE links it to Changi Airport in the East and the major Jurong industrial hub in the West with easy access to the City and the Causeway in the North.

Midview is also close to the Clementi, Jurong East and Bukit Batok MRT stations which makes it an extremely accessible place for everyone.

 

The Map

click to see enlarged image
 

The Specification
 
Structure   Reinforced concrete structure
Brick   Clay bricks and/or aerated concrete blocks
Roofing Tiles   Reinforced concrete flat roof with waterproofing
Ceiling   Skim coat with emulsion paint
Windows   Aluminium frame windows with tinted glass
Doors   Fire rated doors. Fire rated doors and roller shutters for selected units at 1st and 2nd storeys.
Locks   Selected quality locksets to all doors
Flooring   Power float finish to concrete floor at showroom/warehouse/factory areas. Ceramic tile finish to toilet.
Wall Tiles   Ceramic wall tile finish to toilet
Sanitary Installation   Selected samitary fittings complete with pipings
Electrical Installation   4.5 MVA, 3 Phase, 400/230 Volts 50 Hz available for whole building.
Exit signs and essential lights provided to comply with authorities'requirements.
Lift System   4 nos. passenger lifts. 1 no. service lift and 4 nos. cargo lifts.
Floor Loading   20KN/m2 for 1st and 2nd storey; 10KN/m2 for 3rd to 8th storeys.
Communications   Cable ready

 

Contact
For more information, kindly contact
Ong Mei Fen Handphone: 9828-4055
  email: meifen.ong@orangetee.com