| Foundation |
|
Concrete
Bored Piles complying with SS CP4 |
Superstructure
& Substructure |
|
Reinforced
concrete and/or Post Tensioned Concrete Structure complying
with SS CP65 |
Roof |
|
Reinforced
concrete and/or post tensioned concrete structure flat
roof with waterproofing system |
Floor
Loading Capacities |
|
| 1st
storey (warehouse) |
= |
10.0
KN/m2 |
| 1st storey (canteen) |
= |
5.0 KN/m2 |
| 2nd to 4th storey
(factory & warehouse) |
= |
7.5 KN/m2 |
| 2nd to 4th storey
(carpark) |
= |
5.0 KN/m2 |
| 5th storey (factory) |
= |
7.5
KN/m2 |
| 5th storey (roof/carpark) |
= |
5.0 KN/m2 |
| 6th to 16th (factory) |
= |
7.5 KN/m2 |
| Roof |
= |
2.5 KN/m2 |
| All Ramps |
= |
5.0 KN/m2 |
|
Structure
Floor To Floor Height |
|
| 1st
storey |
= |
5.00
meters |
| 2nd to 4th storey |
= |
4.00 meters |
| 5th to 16th storey |
= |
3.5 meters |
| |
|
|
|
Windows |
|
Aluminium
frames with tinted glass window |
Doors |
|
- Timber doors with selected quality lock sets to Factory
and Warehouse units
- PVC doors with quality lock set to toilets |
External
Walls |
|
Reinforced
Concrete/clay brick with cement and sand rendering and
emulsion paint finish |
Ceilings |
|
- Skim coating with emulsion paint to Canteen, Factory
and Warehouse units
- Plaster Board ceilings to toilets and/or skim coat
with emulsion paint |
Internal
Wall Finishes |
|
- Cement and sand plaster with emulsion paint finish
and/or skim coat with emulsion paint
- Homogeneous tiles and Spray textured coating at lift
lobbies
- Ceramic tiles and plaster and paint finish to toilet
walls |
Floor
Finishes |
|
- Power float and/or screed finish to Factory and Warehouse
units
- Homogeneous tiles finish to lift lobbies
- Ceramic tiles to toilet floor |
Lifts |
|
3 service lifts and 1 service cum fireman lift |
| Electricial |
|
-
Emergency lighting including exit sign to each factory
and warehouse unit as required by authorities
- 60A 3 phase power supply to 2nd to 16th warehouse
units and factory units
- 100A 3 phase power supply to 1st storey warehouse
units
- 200A 3 phase power supply to canteen |
| Telecommuncation
Services |
|
Local
box and pre-wired telephone cable up to telephone riser
duct will be provided to each factory/warehouse unit
to facilitate telephone connection upon application
by purchasers |
| Master
Antenna System (MATV) |
|
MATV
tap-out unit is provided in selected electrical risers
on each floor for future tapping off by purchasers |
Fire
Protection |
|
Fire protection system provided in compliance with statutory
requirements |
Sanitary
and Plumbing Installation |
|
Sanitary and plumbing provided in compliance with statutory
requirements |
Mechanical
Ventilation |
|
Mechanical ventilation in compliance with relevant authorities'
requirement is provided to designated areas where natural
ventilation is not possible. |
Communication
System |
|
Communication system provided in compliance with statutory
requirements |
Lightning
Protection |
|
Provided in accordance with Singapore Standard Code
of Practice CP-33: 1996 |
Project
Information |
|
Tenure
of Land: 60 years leasehold w.e.f. 21st March 2005
Lot / Mukim: Lot Nos 3482N and 3405L of Mukim 1
Planning Approval No.: P010805-39G2 dated 31st Oct
2005
Building Plan No.: A1409-00010-2005-BP01 dated 1st
Dec 2005
Expected TOP date: 21st Dec 2012
Expected Date of Legal Completion: 21st Dec 2015 |
| |
|
|