| Foundation |
|
Precast Reinforced Concrete Pile and/or other approved foundation system complying with SS CP4 |
Superstructure
& Substructure |
|
Reinforced concrete and/or post tensioned concrete structure complying with SS CP65 |
Roof |
|
Reinforced concreted and/or post tensioned concrete structure flat roof with waterproofing system |
Floor
Loading Capacities |
|
| 1st
storey (Warehouse) |
= |
10.0
KN/m2 |
| 1st storey (Canteen) |
= |
5.0 KN/m2 |
| 2nd (Warehouse) |
= |
7.5 KN/m2 |
| 3rd to 8th Storey
(Factory) |
= |
7.5 KN/m2 |
|
Structure
Floor To Floor Height |
|
| 1st
Storey |
= |
5.0
meters |
| 2nd Storey |
= |
4.0 meters |
| 3rd to 8th Storey |
= |
3.5 meters |
|
Windows |
|
Aluminium
framed windows with tinted glass |
Doors |
|
Timber doors with selected quality lock sets to Factory
and Warehouse units
PVC doors with quality lock set to toilets |
External
Walls |
|
Reinforced
concrete and/or clay brick with cement and sand rendering and
emulsion paint finish |
Ceilings |
|
Skim coat and/or off-form with paint finish to all units
Plaster board and/or skim coat and/or off-form with paint finish to toilets |
Internal
Wall Finishes |
|
Cement and sand plaster
and/or skim coat with paint finish
Tiles and/or cement and sand plaster and/or skim coat with paint finish to lift lobbies
Tiles and/or cement and sand plaster with paint finish to toilets |
Floor
Finishes |
|
Power float and/or screed finish to Factory and Warehouse
units
Tiles and/or power float and/or screed finish to lift lobbies
Ceramic tiles to toilet |
Lifts |
|
2 service lifts
1 passenger lifts and 1 passenger cum fireman lifts |
| Electricial |
|
Emergency lighting including exit sign to all units provided in compliance with statutory requirements.
100A 3 phase power supply to all Warehouse
units at 1st Storey
200A 3 phase power supply to the Canteen
60A 3 phase power supply to all Warehouose unit at 2nd Storey, except unit #02-10 with 100A 3 phase supply
40A 3 phase power supply to all Factory units at 3rd to 8th Storey |
| Telecommuncation
Services |
|
Local
box and pre-wired telephone cable up to telephone riser
duct will be provided to each Factory/Warehouse unit
to facilitate telephone connection upon application
by purchasers |
| Master
Antenna System (MATV) |
|
MATV
ready tap-out is provided |
Fire
Protection |
|
Fire protection system provided in compliance with statutory
requirements |
Sanitary
and Plumbing Installation |
|
Sanitary and plumbing system provided in compliance with statutory
requirements |
Mechanical
Ventilation |
|
Mechanical ventilation provided in compliance with statutory requirements to designated areas where natural ventilation is not possible |
Communication
System |
|
Communication system provided in compliance with statutory
requirements |
Lightning
Protection |
|
Lighting system provided in compliance with statutory requirements. |
Project
Information |
|
Zoning: Industrial Business 1
Tenure
of Land: 60 years leasehold from 30th June 2008
Lot / Mukim: Lot No. 05149C of Mukim 23
Planning Approval No.: P200808-0212-Z000 dated 5th June
2009
Building Plan No.: A1525-00010-2008-BP01 dated 29th
October 2009
Expected TOP date: 1st April 2016
Expected Date of Legal Completion: 1st April 2019 |