| Foundation |
|
Bored piles foundation and/or other approved foundation system complying with SS CP4 |
Superstructure
& Substructure |
|
Reinforced concrete and/or post tensioned concrete structure complying with SS CP65 |
Roof |
|
Reinforced concrete and/or post tensioned concrete structure flat roof with waterproofing system |
Floor
Loading Capacities |
|
| 1st
storey (Warehouse) |
= |
10.0
KN/m2 |
| 1st storey (Canteen) |
= |
5.0 KN/m2 |
| 2nd to 3rd storey
(Carpark) |
= |
2.5 KN/m2 |
| 4th to 17th storey
(Factory) |
= |
7.5 KN/m2 |
| Roof |
= |
2.5 KN/m2 |
| All Ramps |
= |
5.0 KN/m2 |
|
Structure
Floor To Floor Height |
|
| 1st
storey |
= |
5.00
metres |
| 2nd to 3rd storey |
= |
3.50 metres |
| 4th to 17th storey |
= |
3.30 metres |
|
Windows |
|
Aluminium
framed windows with tinted glass |
Doors |
|
- Timber doors with quality lock sets to Factory
and Warehouse units
- PVC doors with quality lock sets to toilets |
External
Walls |
|
Reinforced
concrete and/or clay brick with cement and sand rendering and
paint finish |
Ceilings |
|
- Skim coat and/or off-form with paint finish to all units
- Plaster board and/or skim coat and/or off-form with paint finish to toilets |
Internal
Wall Finishes |
|
- Cement and sand plaster
and/or skim coat with paint finish to all units
- Tiles and/or cement and sand plaster and/or skim coat and/or spray textured coating with paint finish to lift lobbies
- Tiles and/or cement and sand plaster with paint finish to toilets |
Floor
Finishes |
|
- Power float and/or screed finish to Factory and Warehouse
units
- Tiles and/or power float and/or screed finish to lift lobbies
- Ceramic tiles to toilet |
Lifts |
|
- 3 passenger lifts and 1 service cum fireman lift |
| Electrical |
|
-
Emergency lighting including exit signs to all units provided in compliance with statutory requirements
- 100A 3 phase electrical supply to Warehouse units at 1st storey
- 60A 3 phase electrical supply to Factory units 01 to 08 at 4th to 12th storey, Factory units 01, 02, 07 & 08 at 13th storey & Factory units 03, 06, 11 & 14 at 17th storey
- 40A 3 phase electrical supply to all other Factory units
- 200A 3 phase electrical supply to canteen at 1st storey |
| Telecommuncation
Services |
|
Telephone block terminal and pre-wired telephone cable provided in each Factory/Warehouse unit to facilitate telephone connection upon application by purchasers |
| Master
Antenna System (MATV) |
|
MATV
tap-off box provided in each Factory/Warehouse unit |
Fire
Protection |
|
Fire protection system provided in compliance with statutory
requirements |
Sanitary
and Plumbing Installation |
|
Sanitary and plumbing system provided in compliance with statutory
requirements |
Mechanical
Ventilation |
|
Mechanical ventilation system provided in compliance with statutory requirements |
Communication
System |
|
Communication system provided in compliance with statutory
requirements |
Lightning
Protection |
|
Lightning protection system provided in accordance with statutory
requirements |
Project
Information |
|
Zoning: Business 1
Tenure of Land: Leasehold 60 years from 20th May 2008
Lot/Mukim: Lot No. 10119M of Mukim 24
Planning Approval No: P220508-33A3-Z000 dated 23rd July 2008
Building Plan No: A1409-00002-2008-BP01 dated 20th August 2008
Expected T.O.P Date: 17th February 2016
Expected Date of Legal Completion: 17th February 2019 |
| |
|
|
| Contact |
|
For
more information, please contact: |
| |
|
Main Line: 6763 7227 |
| |
|
Garrick Ong
Handphone:
9336 5559
email: garrick.ong@orangetee.com |