OrangeTee.com
PROJECT LAUNCHES
Enterprise Centre (Techpark 21)
 
A sound investment of excellent value and growth potential.
 
Premium Location

Occupying a prime site just off the PIE, Enterprise Centre is aptly called 'The Gateway to Jurong' being in proximity to Jurong East Regional Centre and International Business Park.

Quick access to CBD is made possible by the PIE and AYE. With the added advantage of being well-served by public transportation, with Bukit Batok and Jurong East MAT stations just minutes away, Enterprise Centre puts you at a vantage position where islandwide access is made ever so convenient. In addition, research facilities such as Science Park, Ngee Ann Polytechnic, NUS and NTU are also within convenient reach.

A large employment pool can be easily tapped from Bukit Batok and Jurong East & West housing estates, providing you with a ready, abundant workforce.

  • Immediate access to PIE
  • Efficient public transport network
  • Minutes to BukitBatok and JurongEast MRT stations
  • Abundant workforce from housing estates


Choice Amenities

Besides meeting your corporate needs, Enterprise Centre also ensures that individual needs are catered for. A large foodcourt on the ground floor provides ready food and beverages for staff. In the vicinity are a myriad of shops, restaurants, cinemas and shopping malls that conveniently cater to your needs.


click here to view site plan
click here to view 1st storey (level 1) plan
click here to view 3rd storey (level 2) plan
click here to view 5th storey (level 3) plan
click here to view 7th & 9th (levels 4 & 5) storey plan
click here to view 11th storey (level 6) plan
click here to view 13th storey (level 7) plan


The Map

click to see enlarged image
 

The Specification
 
Foundation   Grade 40 bored piles
Superstructure & Substructure   Reinforced concrete column, pre-stressed beam and slab system
Roof   Pre-stressed concrete beam & slab with appropriate waterproofing system
Floor Loading Capacities   Level 1 : 15.0 kN/mē
Levels 2 to 7 : 10.0 kN/mē
Mezzanine Level : 4.0 KN/mē
Driveway, Ramp : 12.0 KN/mē
Roof : 2.5 KN/mē
Floor To Floor Height   Levels 1 to 7 - 6.0 metres
Windows   Aluminium frame with tinted glass windows
Doors   - Timber door with quality lock set, PVG door with quality lock set to toilet.
- Electrically operated metal roller shutter to factory unit's frontage
Wall   Clay brick/aerated concrete block
Ceiling   - Skim coating with emulsion paint
- Suspended false ceiling to lift lobbies
Internal Wall Finishes   - Cement and sand plaster with emulsion paint finish for factory units and common areas.
- Ceramic tiles dado and cement & sand plaster with emulsion paint finish up to ceiling height to factory units designated for food industries.
- Homogeneous tiles at level 1 lift lobby; spray textured coating at levels 2 to 7 lift lobbies.
- Ceramic tiles to toilet walls.
Floor Finishes   - Power float finish to factory units and common areas.
- Epoxy floor coating to factory units designated for food industries.
- Homogeneous tiles to lift lobbies.
- Homogeneous tiles to toilet floor.
Electronic Installation   - 60 amp, 3 phase isolator only to units on levels 1 to 5.
- 100 amp, 3 phase isolator only to units on levels 6 & 7.
- Emergency lighting including exit sign to each factory unit as required by authorities.
Lifts   6 passenger lifts (24-person capacity)
Fire Protection   - Sprinkler system in compliance with statutory requirement
- Dry risers, hosereels and smoke extraction system in the common areas
A/C Ledges   A/C ledge to each factory unit
Sanitary and Plumbing Installation   - Sanitary and plumbing in compliance with authorities' requirement
- Sampling sump and designated waste drainage pipe connecting to common grease trap to factory units designated for food industries
Mechanical Ventilation (ACMV)   Mechanical ventilation in compliance with relevant authorities' requirement to designated areas
Telecommunication Services   Cable tray from the MDF room/telephone risers to the common corridor
Master Antenna System (MATV)   MATV tap-off unit in electrical risers on each floor for future tapping off by purchasers

 

Contact
For more information, kindly contact
Garrick Ong Handphone: 98196646
  email: garrick.ong@orangetee.com