


PROJECT LAUNCHES
Mountbatten Square |
| |
| |
| Where Work & Fun is a Lifestyle |
|
| |
Next To Central Business District (CBD) |
- 10-minute drive to the Raffles Place business and financial hub and the upcoming Marina Bay district
- Well connected to the rest of the island via Nicoll Highway and major expressways like the East Coast Parkway (ECP), Pan-Island Expressway (PIE) and the Kallang-Paya Lebar Expressway (KPE).
- Located near to the future Mountbatten Mass Rapid Transit (MRT) station along the Circle Line (2010 completion schedule)
- Short 5-minute bus ride from the current Kallang MRT station
|
Eat, Shop & Unwind |
- Variety of food centres and eating outlets at nearby HDB estates at Old Airport Road, Kallang and Geylang areas.
- Short drive away from major shopping malls including Suntec City Mall, Bugis Junction, Parkway Parade and Kallang Leisure Mall.
- Unwind at nearby East Coast Park and relaxing beach locale.
|
Ouststanding Business Facilities |
- Impressive lift lobby that service every floor.
- Smart card access system to premises.
- 24-hour security with CCTV monitoring system
- High speed broadband internet system
|
|
|
Private Corporate Space
|
 |
- Flexible floor layouts for all types of business.
- De-centralised air-conditioning system for your specific business operation hours plus cost saving.
- 380 ground level car park area for easy office access.
|
|
|
|
|
Specifications
|
| |
Structure |
|
Reinforced and/or pre-stressed structure |
Brick |
|
Clay bricks and/or aerated concrete blocks |
False Ceiling |
|
Mineral fibre board |
Windows |
|
Aluminium frame window with tinted glass |
Doors |
|
Timber and/or metal doors |
Locks |
|
Selected quality locksets to all doors |
Decoration |
|
Plastering with emulsion paint |
Flooring |
|
Power float finish to concrete floor. Ceramic tile finish to toilets |
Wall Tiles |
|
Selected ceramic wall tiles to toilet |
Floor Loading |
|
4 kn/m2 to all floors |
Electrical Installation |
|
60 Amp, 3 phase 400/230 Volts, 50Hz |
Sanitary Installation |
|
Selected sanitary fittings complete with piping |
Communications |
|
Broadband ready |
Lify System |
|
3 nos. passenger lifts and 1 nos. service lift |
| |
|
|
Contact |
|
For more information, please contact: |
|
|
Ms Ong Mei Fen |
|
|
Handphone: 9828-4055 |
|
|
email: meifen.ong@orangetee.com |
|
|
Mr Dan Koh |
|
|
Handphone: 9790-2696 |
|
|
email: dan.koh@orangetee.com |
|
|
|
COPYRIGHT© ORANGETEE.COM PTE LTD. ALL RIGHTS RESERVED.