OrangeTee.com
PROJECT LAUNCHES
Euphony Gardens
Overview | Location | Floor Plans | Specification | Facilities
 



FOUNDATION
SUPERSTRUCTURE
WALLS
ROOF
CEILING
FINISHES
WINDOWS
DOORS
IRONMONGERY
SANITARY FITTINGS
ELECTRICAL INSTALLATION
 

TV/FM POINTS
TELEPHONE POINTS
LIGHTING PROTECTION
PAINTING
WATERPROOFING
DRIVEWAYS & CARPARK
GATE AND FENCING
TURFING
RECREATIONAL FACILITIES
ADDITIONAL ITEMS
NOTES




FOUNDATION
Reinforced concrete driven piles.
Back To Top



SUPERSTRUCTURE
Reinforced concrete using Grade 35 concrete complying with SS26 and steel reinforcement
bar complying with SS2.
Back To Top



WAllS
External - common brick
Internal - common brick and/or block wall
Back To Top



ROOF
Pitched roof
- Clay roof tiles with aluminium foil insulation
- Tanalised timber roof rafters
Back To Top



CEILING
  • Moisture resistant ceiling board to all bathrooms
  • Fibrous plasterboard for kitchen
  • Fibrous plasterboard for floors immediately below pitch roof only
  • Skim coat with emulsion paint to other areas

Back To Top



FINISHES
A) Wall
  • Internal
    • Marble and wall plaster with emulsion paint for master bath
    • Ceramic tiles and wall plaster with emulsion paint for bath 2. bath 3 and WC
    • Ceramic tiles and wall plaster to kitchen (no tiles behind kitchen cabinet)
    • Cement & sand plaster with emulsion paint to other areas
    • Skim coat with emulsion paint finish to household shelter

  • External
    • Cement and sand plaster with exterior paint to exterior, balcony, private
      enclosed space & roof garden.

  • Common Areas
    • Natural stone/ ceramic tiles finish and cement & sand plaster with emulsion
      paint to lobbies at Ist storey
    • Cement & sand plaster with emulsion paint to lobbies at basement, 2nd,
      3rd and 4th storey

B) Floor
  • Internal
    • Marble with 100m high timber skirting to living and dining
    • Marble to masterbath
    • Ceramic tiles to bath 2, bath 3, kitchen, yard and WC
    • Timber parquet with skirting to bedrooms and study
      (no parquet under built-in wardrobes area)
    • Cement sand screed finishes to household shelter

  • External
    • Ceramic tiles to private enclosed space, balcony and roof garden.

  • Common Areas
    • Natural stone/ ceramic tiles finish to lobbies at basement & lst storey
    • Ceramic tiles to lobbies at 2nd, 3rd & 4th storey
    • Natural stone/ ceramic tiles finish to swimming pool deck
    • Natural stone pavior/ ceramic tiles/ premix to entrance driveway
    • Granolithic finish to walkway & jogging tracks

Back To Top



WINDOWS
Powder coated aluminium framed windows with 6mm tinted float glass.
Back To Top



DOORS
  • Solid timber door to main entrance
  • Timber flush door to all internal doors
  • Powder coated aluminium framed sliding doors with 8mm tinted float glass to living &
    study at attic (where applicable)
  • Powder coated aluminium framed swing doors with 8mm tinted float glass to study at
    attic (where applicable)
  • Timber swing door to yard toilet
  • Metal blast door to Household Shelter

Back To Top



IRONMONGERY
Selected quality lockset to all doors
Back To Top



SANITARY FITTINGS
Master bathroom 1 long bath complete with bath mixer and shower set
1 vanity top with under counter basin and basin mixer
1 shower cubicle complete with shower mixer and shower set
1 pedestal water closet
1 soap/ sponge holder
1 soap holder
1 mirror
1 paper holder
1 towel rail

Bath 2 & 3 1 vanity top with under counter basin and basin mixer
1 shower cubicle with shower mixer and shower set
1 pedestal water closet
1 soap holder
1 mirror
1 paper holder
1 towel rail

W.C. 1 wall hung basin with tap
1 shower tap and shower set
1 pedestal water closet
1 soap holder
1 paper holder

Yard 1 bib tap

Back To Top



ELECTRICAL INSTALLATION
Concealed electrical wiring (except in yard and household shelters) with adequate provision
for lighting and power points.
Back To Top



TV/FM POINTS
Provision of TV / FM points suitable to receive Singapore Cable Vision to living room, all bedrooms
and attic study (for attics without bedrooms). Refer to Electrical Schedule for details.
Back To Top



TELEPHONE POINTS
Provision of telephone points to living room, all bedrooms and attic study (for attics without bedrooms).
Refer to Electrical Schedule for details.
Back To Top



LIGHTNING PROTECTION
In accordance with Singapore Code of Practice CP33: 1996.
Back To Top



PAINTING
- Emulsion paint to internal wall
- Exterior paint to external wall
Back To Top



WATERPROOFING
Waterproofing to floor of kitchen, bathrooms, WC, yard, balcony and roof garden.
Back To Top



DRIVEWAYS & CARPARK
Concrete floor with hardener to basement driveway and carpark.
Back To Top



GATE AND FENCING
Brickwall/mild steel/chain link fencing
Back To Top



TURFING
Cow Grass
Back To Top



RECREATIONAL FACILITIES
- Swimming pool and wading pool
- Jacuzzi
- Children's playground
- Barbecue pits
- Exercise station and jogging track
- Clubhouse with multi-purpose hall and games room
- Changing rooms with steam room
- Gymnasium
- Tennis courts
- Musical garden
- Water feature

OTHER FACILITES
- Management Office
Back To Top



ADDITIONAL ITEMS
  • Kitchen cabinets/ appliances: High and low laminated kitchen cabinets with granite worktop, sink,
    oven, hood and hob
  • Air-conditioning"": Wall mounted split air-conditioning to living and dining rooms, bedrooms and study
  • Audio intercom provided to each unit
  • Hot water supply to masterbath, bath 2 and bath 3
  • Built-in wardrobe to all bedrooms except study

Back To Top



NOTES
* Marble are natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non- conformity cannnot be totally avoided

** Air-conditioning system has to be maintained and cleaned on a regular basis by the Purchaser. This includes the cleaning of filters and clearing the condensate pipes to ensure good working condition of the system
Back To Top





Developer: Northspring Development Pte Ltd
Legal Description: Lot 3459K MK 13 at Sembawang Road/Jalan Mata Ayer
Tenure of land: 99 Years leasehold w.e.f 25 February 1998
Developer's License No.: B 1378
Building Plan No.: BP A0819-121-1998-BP01 dated 2 August 1998 & BP A0819-121-1998-BP02 dated 3 September 1999
Expected TOP: 30 November 2002
Date Of Legal Completion: 30 November 2005
Back To Top


The information contained herein are subject to changes as may be approved by the relevant authorities and do not form part of an offer or contract. All art renderings and pictures are aritsts' impressions or photo-library photographs only and all areas stated herein are subject to re-survey. While every reasonable care has been taken in providing the information and specifications herein, the Owner and Developer cannot be held responsible for any inaccuracy.