|
A Step Ahead In Business. |
|
Century Warehouse is a modern premium class industrial
development ideally located at 100E Pasir Panjang Road,
well within Singapore's established industrial belt. Towering
8 floors, the top 7 levels are well suited for operational
space and warehousing needs of industry and business concerns.
The spacious ground floor is creatively designed to provide
flexibility for showroom usage. Every effort has been made
to ensure that tenants are offered a highly conducive
and comfortable working environment in which peak
performance and efficiency will be achieved. Century Warehouse
has the added advantage of the established Developer's quality
assurance and support. Besides, it is a nucleus of skills,
manufacturing and logistic support all converged at one
location, a one-stop solution for tomorrow's business needs.
|
Free DHTML scripts provided
by Dynamic Drive
|
Crossroads of Industry A combination of prime
location and excellent infrastructural support, Century
Warehouse is strategically located within Pasir Panjang
industrial estate and directly across the road from PSA
wharf, an area designated for future expansion as a commercial,
industrial and leisure hub. The immediate surroundings include
ancillary amenities such as eating establishments, offices
and industrial complexes.
It is also conveniently linked to a network of major roads
and expressways such as the PIE, AYE, ECP and CTE. This
modern development is within cloase proximity to the Port,
Business Parks, Central Business District, World Trade Centre
and Jurong Industrial Estate.
The Easy access to public transport and the convenience
of the up and coming proposed MRT at World Trade Centre,
more than adequately cover the needs of commuters providing
a potentially large labour pool from the surrounding housing
estates. In high demand, Century Warehouse is a
choice landmark for meeting today's industrial needs.
|
| Space
Functionality & Features |
Every aspect of the building is meticulously planned for
space functionality and efficiency.
The
modern aesthetics of the premises is achieved with high
building specifications to provide optimal flexibility and
operational ease in clean, pollution-free surroundings to
enhance your corporate image.
Acknowledge
the demands of tenants for a stable, uninterrupted and vibration-free
environment, the floor capacity of the building has been
strengthened to 15kN/m² with the 1st storey capable
of bearing up to 20 kN/m². Vehicular layout further
segregates container traffic and private cars for uninterrupted
movement of goods and people. Served by separate passenger
and cargo lifts, other distinct features include covered
loading and unloading bays, ample surface and basement carparking,
automatic fire alarm and sprinkler systems and other infrastructural
support and services, giving your business a competitive
edge to get ahead of the competition.
click
here to view cross-section plan
click
here to view 1st storey plan
click
here to view 2nd, 4th - 7th storey
plan click
here to view 3rd storey plan
click
here to view 8th storey plan
|
click
to see enlarged image |
The Map |
|
Features and Facilities |
| Automatic
carpark barrier with card access system at entrance
of building |
Ample
carparking
10 surface lorry parking lots
12 surface carparking lots
24 basement carparking lots |
| 1
passenger lift of speed 90m/min (with 15 persons
capacity) |
2 cargo lifts of speed 45m/min (with
3,000 kg capacity each)
Lift car size: 2.5m(W) x 3m(D) x 2.6m(H)
Lift door size: 2.1m(W) x 2.5m(H) |
|
3 loadingand unloading bays |
| 3
docklevellers (with 11,000 kg capacity each) |
Floor loading
1st storey: ~20 KN/m²
2nd - 8th storey: ~15 KN/m² |
| High
ceiling of 5m ~ 7m for maximum utilisation of storage
space |
|
Knock-out panel between 1st storey showroom
and 2nd storey warehouse for future provision of internal
staircases |
|
2 private toilets within each warehouse unit
at upper storeys |
|
Fire alarm and sprinkler systems |
|
24-hour building security system with CCTV |
|
Emergency generator for essential services |
|
Specification |
|
Structure |
Raft
foundation with RC Frame |
External |
-
Sprayed textured coating on wall
-
Anodised aluminium framewindows with tinted glass |
|
Internal |
Floor
Finishes
- Homogenous ceramic tiles to Passenger Lift Lobbies/Toilets
- Concrete floor to Showrooms (at 1st storey)/Warehouse
Units/Goods Lift Lobbies/Loading & Unloading Bays
- Cement screed to Staircases/Smoke Free Lobbies
Wall
- Polished homogenous tiles to Passenger Lift Lobbies
- Concrete plaster with emulsion paint to Showrooms
(at 1st storey)/Warehouse Units/Goods Lift Lobbies/Loading
& Unloading Bays/Smoke Free Lobbies/Staircases
- Exposed metal grid to Toilets
Ceiling
- Plaster ceiling to Passenger Lift Lobbies
- Exposed grid to Good Lift Lobbies at upper storeys
- Plaster with emulsion paint to Showrooms (at 1st storey)/Warehouse
Units/Goods Lift Lobbies/Loading & Unloading Bays/Smoke
Free Lobbies/Staircases
- Exposed metal grid to Toilets |
M&E
Services |
Electrical Services
- Electrical supply for each unit is 60 Amp 3-phase
except for #01-03 which is 80 Amp 3-phase
- Individual Distribution Board provided in each unit
- One (1) standby generator for essential services in
times of power failure
Lightings
- Recessed downlights for Passenger Lift Lobbies
- Recessed fluorescent light fittings for Corridors/Toilets/Upper
storey Goods Lift Lobbies
- Low bay discharge light fittings for Loading &
Unloading Bays/1st storey Goods Lift Lobbies
Security & Telecommunication
- CATV system in electrical riser with cable trays provided
to each unit for tapping off
- CCTV system will be installed at all Goods Lift Lobbies,
entrances and perimeter of the building for enhanced
security
-Ample telephone points at telecom riser with cable
trays provided to each unit for tapping off
Fire Protection System
- Extra High Hazard Group Fire Sprinklers and Automatic/Manual
Fire Alarm System complemented with Fire Hydrants, Dry
Risers & Hosereel Systems designed in accordance
with the relevant Code of Practice
Air-conditioning & Mechanical Ventilation
System
- VRV Airconditioning System is provided to Passenger
Lift Lobbies
- Natural ventilation to warehouse units with provision
of louvres at external wall for future installation
of airconditioning systems
- Mechanical ventilation is provided for basement carpark
and toilets
Lighting Protection System
- Provided in accordance with Singapore Standard CP33:1985 |
|
| |
Contact |
| |
|
|